Skip to main content

Building Construction

Building Construction
Image
8
Image
7

Construction of Al-Husayniyah Mixed Basic School / Ma'an Governorate

The project involves the construction of Al-Husayniyah Basic School in the city of Al-Husayniyah, consisting of three floors. The ground floor, with an area of 1,116.56 m², includes a multipurpose hall, a changing room, and a computer lab. The first floor covers 909 m² and contains 11 classrooms and a health unit. The second floor has an area of 240 m². Additionally, the project includes external works such as curbs, paved yards covering 3,000 m², surrounding fences, a guard room, a water tank, and an absorption pit.

Tender for the Rehabilitation of the Yard and Offices of the Ma'an Developmental Customs Center in Al-Rawda Industrial Area

The work involves the rehabilitation of inspection yards for trucks, including the construction of a metal canopy and a room for inspectors, elevated concrete surfaces, and the renovation of offices to suit the operations of the Customs Department.

Construction of a Mixed Basic Double-Shift School / Ma'an Governorate

The project involves the construction of a double-shift basic school in the city of Ma'an, covering a total area of 2,263 m² and consisting of five floors. The basement floor, with an area of 302 m², includes a kindergarten, a classroom, a buffet, a boiler room, and a diesel room. The ground floor, covering 578 m², contains a multipurpose hall, changing rooms, and a computer lab. The first floor, also 578 m², houses five classrooms, a health unit, and a science laboratory. The second floor has an area of 578 m², while the third floor covers 179 m².

Construction of a building complex for halls and laboratories

Construction of the Teaching Base and Laboratories building as part of the second phase of Al-Hussein Bin Talal University campus, consisting of concrete, stone, and glass facades. The project includes all civil works, finishes, electrical, and mechanical works. The building has three floors with an approximate total area of 5,947 square meters, in addition to external works.