Skip to main content

Building Construction

Building Construction
Image
8
Image
7

Implementation of Additions to the 51st Group of Schools / Ma'an Directorate of Education

The project involves the construction of classroom and laboratory additions for several schools in the Ma'an Qasabah District, with a total expansion area of approximately 1,300 square meters. The buildings are constructed using brick and concrete, with concrete facades and exterior paint. The scope also includes the necessary yard paving and sidewalks at each site, in addition to electromechanical works and finishing.

Staff Housing for Workers and Employees of the Company / Residential Area 10 / Aqaba

The project involves the construction of staff housing for the company in Aqaba. The building consists of four floors constructed with concrete and brick, comprising dormitory rooms and bathrooms. The scope includes finishing works, electromechanical works, as well as external works such as boundary walls and paved yards, with a total estimated area of 700 square meters.

Construction of the Water Administration Building – Ma'an Governorate

The project consists of the construction of a two-story building (ground and first floors) with a total area of 700 square meters. The structure is built using concrete and brick, with exterior facades finished in stone. The scope of work includes all finishing works and electromechanical systems, including a central heating system (boiler). External works include 1,500 square meters of asphalted yards, external sidewalks, boundary walls, and 191 linear meters of retaining walls.

Implementation of Housing Units for Poor Families (Phase Two) – Jerf Al-Darawish Housing Project / Tafila Governorate

The project consists of the construction of 15 residential units in Jerf Al-Darawish, Tafila Governorate. Each unit has an area of 70 square meters and is constructed using concrete and bricks. The scope of work includes full interior civil and electromechanical finishes, as well as external works such as sidewalks and boundary walls."

Construction of the Administration Building for the Ma'an Electricity Distribution Area

It involves the construction of administrative offices for the Ma'an Electricity Distribution Company, located in the city of Ma'an. The building is constructed using concrete, bricks, and stone, with an approximate area of 331 square meters. The project also includes external works such as reinforced retaining walls with a height of 6 meters, paved yards, sidewalks, and a soakaway pit. Additionally, it includes electrical, electromechanical works, finishing works, and a central heating system (boiler).

Maintenance and construction of sanitation units for schools in the Al-Husseiniya area / Southern Badia District

The project involves the maintenance and construction of sanitation units for schools in the Al-Husseiniya area, located in the Al-Husseiniya District. The scope of work includes comprehensive internal and external maintenance of standalone sanitation units across several schools. This includes painting, wall and floor tiling, toilet repairs, maintenance of floor slopes to ensure proper drainage, and the repair and servicing of electromechanical installations.

Construction of Safiya Bint Abdul Muttalib Mixed Basic School / Petra Region / Ma'an Governorate

The project involves the construction of a building made of concrete blocks with a capacity of 12 classrooms, with a total area of 731 square meters distributed over three floors.

It also includes external works such as boundary walls, retaining walls, paved yards, and the maintenance of the sanitation unit.

Implementation of the Queen Rania Community Empowerment Center building project in Aqaba Governorate.

The project involves the construction of the Queen Rania Community Empowerment Center in Aqaba. The building is made of concrete blocks with a central stone wall reaching the full height of the structure, while the remaining façades are finished with colored ready-mix plaster.

The total built-up area is 1,497 square meters, distributed over four floors, constructed on plot No. 157 in Salah Al-Din neighborhood, Aqaba, in accordance with the prepared plans.