Skip to main content

Construction of Ma'an Substation (132kV/400kV) and expansion of Al-Qatraneh and Airport substations

Image
1
Image
1
Image
1
Image
1
Image
1
Image
1
Image
1
Image
1
Image
1
Image
1
Image
1
Image
1

Project Details

Image
1
Project Date
2018
Image
1
Total Project Cost
2040596
Image
1
Location
Ma'an / Al-Qatraneh

Interested in Similar Projects?

Contact us to discuss your construction and development needs.

Get Quote 

Project Overview

The Ma'an Power Station project involves excavation works across the entire site, covering an area of 100,000 m², along with the construction of reinforced concrete foundations for the electricity towers. It also includes the creation of trenches or channels for electrical installations between the towers and the control building, as well as reinforced retaining walls with fire-resistant facing around the site, totaling approximately 1300 linear meters, topped with fencing. Additionally, drainage channels for water management throughout the project are being constructed. The expansion of the Al-Qatraneh and Airport Power Stations includes excavation and leveling of the expansion area, construction of reinforced concrete foundations for the electricity towers, trenches and channels for electrical installations between the towers and the control building, concrete drainage channels, new asphalt roads, and reinforced retaining walls for specific zones within the new expansion.