Project Overview
The project involves the construction of concrete buildings, including a main gate with an area of 21 m², a three-story teachers’ club with a total area of 766 m², and two-story classroom blocks with a total area of 2,284 m². It also includes the construction of a storage building (110 m²), a sports field, and a 100 m³ underground water tank with a pump room, as well as a side gate and all external works as detailed in the tender documents. Additionally, the project includes the construction of one absorption pit measuring 3×3 meters and another absorption pit measuring 4×4×8 meters.
The scope also covers all civil and architectural works, site leveling, paving, metal works, external plastering, decorative painting, metal fencing, curbstone installation, external utility networks for buildings, cement tile works, and asphalt paving. Furthermore, the project includes comprehensive electrical works, such as transformers, solar power systems, electrical distribution networks for lighting and building power, telecommunication systems, grounding systems, lighting, interior electrical works, fire alarm systems, bells, and UPS systems.