Retaining walls
Construction of reinforced concrete walls, stone walls, rubble concrete, and plain concrete works.
Construction of reinforced concrete walls, stone walls, rubble concrete, and plain concrete works.
Execution of road openings, leveling, and base course works (first and second layers), including primary main surface works and initial final surface works.
Construction of an earthen pond with an inlet and outlet, having a storage capacity of 25,000 m³.
Installation of concrete pipes with diameters of 50 cm and 90 cm, along with catch basin and manhole works.
It consists of constructing a reinforced concrete underground water reservoir with an approximate capacity of 10,000 m³, embedded in the soil, including internal waterproofing works, expansion joints, and a water stop system.
Carrying out hot asphalt patching works.
Carrying out hot asphalt patching works.
Reconstruction of Abu Al-Alaq Al-Gharbiyah Road, including earth base layers and asphalt mixtures.
Reconnecting the road branching from Al-Sahaba Tunnel with Abdoun Corridor on Airport Road, with an approximate length of 320 meters and a final width of 6 meters.
The work includes earthworks (excavation and backfilling), pavement layer construction, and hot asphalt mixtures.
This tender includes maintenance and construction works for several roads distributed as follows:
Reconstruction of Zainab / Al-Riwaq Road